Construction site · Cast in situ

Striking formwork on measurement. The standard in the Netherlands for forty years.

Dutch contractors have known the maturity computer for decades. The same measurement, the same method. But the box now sends the data itself, you see it on your phone, and the report is ready when your client asks for it.

A red Sensorbox on the concrete edge of a floor slab; the blue measuring cable runs to the measuring point in the rebar.
On siteThe box on the edge, the cable to the measuring point in the rebar
40 years
Striking on measurement,
in Dutch construction
De Vree
Calculates using
weighted maturity
3 sensors
Per Sensorbox,
25 m cable per sensor
7 languages
Platform and report,
also for your crew
How it works

From pour to report. Click on a product.

Pour, measure, send, know, strike. Click a red dot in the drawing, or choose a product below the drawing.

Verboom Platform

The same measurement. No reading out, no printer.

What the planner, the site manager and your client notice from the first pour.

First page of a measurement report from the platform: measurement details, the sensors and the calibration curve with five cubes.
01

The report your client asks for

A report per pour: per sensor, per hour, with the calibration curve and the calculation rule. Calculates using the maturity method (NEN 5970). Ready the moment you need it, not after an afternoon of reading out data in the site cabin.

Ask for a sample report
PDFcalibration curve from your concrete plant5 cubes · C 1.45
Graph from the report: five cubes, the regression line through them and the calibration curve just below it, compressive strength against maturity in °C·h.
02

The calibration curve from the PDF

Drag in the calibration curve from your concrete plant. The cubes and the C-value are read out, you check them, and the platform tests the curve against the requirements of NEN 5970. That saves a planner an afternoon per project.

What is a calibration curve? (in Dutch)
The start button and the label on the lid of the Sensorbox BM-413.
03

One press of a button

Place the Sensorbox on the pour, or attach it with the magnet to the steel formwork, and press the button. The measurement runs. You get a notification by app, text or email when the target is reached. With the LED tower (option), the light on site also switches to green, for anyone without a phone in hand.

Quick Start
In tunnel formwork, the red Sensorbox stands on the edge of an open grey case holding the MCR-21 maturity computer.
On the left the Sensorbox, on the right the MCR-21 in its case. The same tunnel, the same measurement.
Already measuring with the MCR-21?

You already measure with us. This is the next generation.

The MCR-21 still works fine, and it stays on as a backup. It has been transmitting by itself since around 2011, via GPRS. The Sensorbox takes the same measurement using the same method, with the Verboom Platform behind it: the calibration curve from the PDF, a report per pour and the notification by app, text or email.

MCR-21Sensorbox
MethodWeighted maturity according to De Vree (NEN 5970)The same method, the same calculation rule
SendingTransmits by itself, via GPRS (since around 2011)Sends by itself, every 10 minutes, via LTE-M
FollowingWeb interface, email or text at the targetVerboom Platform, notification by app, text or email
ReportPrinter in the casePDF per pour, per sensor, per hour
OperationDisplay and keys in the caseOne button; the rest in the platform

You can switch over per project. Your earlier measurements and calibration curves stay in the platform.

Pour · Measure · Control · Know

Measuring is half the job.

The other half is acting on what you measure. On the construction site we do that with two partners, each in their own field: they supply the cooling or the heat, we supply the measurement and the signal.

Cross-section drawing of a mass concrete block: cooling pipes through the concrete, sensors in core and edge, the Sensorbox controlling the cooling unit, and core 54 °C, edge 41 °C in the platform.
Cooling · together with Hoteco

Keeping mass concrete cool

Thick concrete gets hot on the inside. Above 65 to 70 °C in the core, damage is a risk, and too large a difference between core and edge causes cracking. We measure in the core and at the edge; the cooling pipes of our partner Hoteco are controlled on those measurements.

  • Sensors in the core and at the edge
  • The core below 65–70 °C, the core–edge difference monitored
  • The report shows that it went that way
A Sensorbox hangs on the orange tunnel formwork, next to a heater; the blue measuring cable lies coiled underneath.
Heating · with partner Verboom Installatietechniek

Tunnel formwork strong in time, even in the cold

If your concrete still has to be strong in time in the cold, our partner Verboom Installatietechniek supplies the heat. They have been heating tunnel formwork construction for decades: tunnel formwork heaters in the tunnels, the propane tank and the complete installation, with service on site. We determine the maturity in the concrete and switch the heaters off as soon as the striking strength is reached. That way you heat no longer than necessary and strike the formwork on time every morning.

Two companies. Verboom Installatietechniek is an independent company, separate from Verboom Concrete Technology. The same roots in 1956, and since around 2021 each with its own owner. For heat and installation, call them directly: +31 182 37 98 42.

How winter concreting works
Infrastructure and mass concrete

Bridges, tunnels, viaducts. The same method.

You measure a bridge deck, a tunnel wall or a viaduct pier just like a floor: sensors in the places that matter, the thickest and the coldest, in core and edge. Only with more measuring points, and often with cooling as well. Every sensor counts; never one on its own as the answer.

  • BridgesDeck and piers, core and edge at the same time
  • TunnelsWalls and roof, also in the formwork
  • ViaductsMassive piers that you keep cool
For the structural engineer

For whoever signs their name to it.

Calculates using the maturity method (NEN 5970), with the calibration curve below the regression line, and never below the first cube. Put your striking strength on the drawing and as the target in the platform; the report shows when, and on what basis, it was reached.

  1. The method of the standardWeighted maturity according to De Vree, the maturity method of NEN 5970, with the C-value of the cement.
  2. The calibration curve lies below the regression lineThe line through the cubes of your concrete plant, shifted downwards as the standard requires. One calibration curve per mix, per supplier.
  3. Never below the first cubeThere the platform shows “< x”, not a strength. Above the last cube it goes at most 25 % further, and it says so.
  4. Better too low than too earlyOnly values that were actually measured count. If something drops out, the lowest temperature counts.
  5. The control cube staysWe do not replace it. But you do see when it is needed.
They measure with Verboom
  • Dura Vermeer
  • Gebroeders de Koning
  • Roco
Contact

Know when your concrete is ready.

Want to see how it works on your own project? Call or email us and we will look at your next pour together.