The sensor sits in the casting bed
A fixed measuring point in the mould: you no longer make anything per pour, and no cable stays behind in the element. The Sensorbox stays in place; the mould measures itself.
In the precast plant you know when you demould. The question is whether you make it every day, and what it costs in gas, electricity and cement. Verboom measures in the mould and controls the heating on what the concrete needs, not on what the clock says.
Pour, measure in the casting bed, heat on maturity, demould on time. Click a red dot in the drawing, or choose a product below the drawing.
A fixed measuring point in the mould: you no longer make anything per pour, and no cable stays behind in the element. The Sensorbox stays in place; the mould measures itself.
A ball valve on the casting bed, which the platform opens in percentages via LoRa. Not on or off, but as far open as the concrete needs, and closed as soon as the target is reached.
Temperature, maturity and strength against the calibration curve of your mix, as a PDF. Coming: placing each batch next to the previous one, so you see when one runs differently.
How it works: per casting bed you see what has been poured, how far the concrete is from release, and what the valve is doing. Anyone without a screen looks at the LED tower in the hall (option): red means wait, green means free.
Organised the way you are: a plant has halls, a hall has casting beds (in the platform: lines). A line is a prestressing bed, mould, table or curing chamber. A new hall can copy the layout of another.
On the right is what has not been placed yet. Drag a Sensorbox onto a line and it becomes a measuring point there; a valve works the same way. On a tablet: tap it and choose Place here.
Product and element as the title, with mix, calibration curve and order below. A free line has the Start pour button to begin the next one.
The bar runs up to release: the lowest sensor against the target strength. When the time comes: Release strength reached. Mould off and demoulding are two targets; set more than one per measurement.
No name to think up and no box to look for. You start at the line where you are pouring, and fill in what you are pouring.
On the hall board, at a free line. The platform then knows which boxes are on it.
One button. The form opens with the card Pour on Line 3 · Hall 3.
Product, element, mix and, if needed, the order. The mix selects the calibration curve that goes with it; each line has a default mix ready.
On the boxes of that line. On the hall board, the pour appears with product and element as the title.
The gateway connects the heating valves and the LED towers wirelessly (LoRa) to the Verboom Platform. The Sensorboxes send their measurements themselves, via LTE‑M.
No plant network and no Wi-Fi needed. Your IT environment stays out of it.
No cables to every casting bed. Valves and LED towers connect to the gateway via LoRa.
The valve controls on maturity, not on the clock. Heat only where the concrete is lagging behind, and closed as soon as the target is reached.
Then there is cement in it that you do not need. In the precast plant, the mix is your own choice. The measurement shows per batch how much margin there is.
We work it through with you, with your own cement price and your own cycle. An order of magnitude, not a promise.
The concrete standard sets a minimum cement content per exposure class, and a different mix needs a new calibration curve. We provide the insight; you and your concrete technologist decide.
And do not heat for longer than that. Want to see how it works on your own line? Call or email us and we will look at your hall together.