Precast plant · precast concrete

The same cycle every day.
With less heating.

In the precast plant you know when you demould. The question is whether you make it every day, and what it costs in gas, electricity and cement. Verboom measures in the mould and controls the heating on what the concrete needs, not on what the clock says.

A precast hall with long steel casting beds side by side, some with fresh concrete, one with rebar, and a yellow overhead crane at the back.
Plant → hall → casting bedPhoto Verboom
0–100 %
Heating valve
infinitely variable
1 gateway
Per hall, with its own
SIM card
2+ targets
Per measurement: mould off
and demould
De Vree
The platform
calculates using
The film · 0:47

One cycle in the hall, from pouring to demoulding.

How it works

See how it works. Click on a product.

Pour, measure in the casting bed, heat on maturity, demould on time. Click a red dot in the drawing, or choose a product below the drawing.

Measure, control, know

The mould measures itself. The valve heats until the target, no further.

Measure · in the mould

The sensor sits in the casting bed

A fixed measuring point in the mould: you no longer make anything per pour, and no cable stays behind in the element. The Sensorbox stays in place; the mould measures itself.

Control · developed in-house

The Verboom heating valve

A ball valve on the casting bed, which the platform opens in percentages via LoRa. Not on or off, but as far open as the concrete needs, and closed as soon as the target is reached.

Know · per element

A report for every element

Temperature, maturity and strength against the calibration curve of your mix, as a PDF. Coming: placing each batch next to the previous one, so you see when one runs differently.

The hall board

Every casting bed in your hall on one screen.

How it works: per casting bed you see what has been poured, how far the concrete is from release, and what the valve is doing. Anyone without a screen looks at the LED tower in the hall (option): red means wait, green means free.

The hall board of Hall 3 in the Verboom Platform, shown in the Dutch interface. On the left the tree with plants and halls. Lines 1 and 2 have a pour running: product and element as the title (hollow-core slab 200, batch 14), below that mix, calibration curve and order, a bar up to release and a valve that is heating. Line 3 is free, with the Start pour button; line 4 is free and does not have a box yet. At the top: lines occupied, first ready, valves on and the LED tower; on the right the devices not yet placed.
Example with made-up data, in the Dutch interface. On screen you see your own plant, halls and casting beds.
1 Plant, hall, casting bed

Organised the way you are: a plant has halls, a hall has casting beds (in the platform: lines). A line is a prestressing bed, mould, table or curing chamber. A new hall can copy the layout of another.

2 Drag a box or valve onto a line

On the right is what has not been placed yet. Drag a Sensorbox onto a line and it becomes a measuring point there; a valve works the same way. On a tablet: tap it and choose Place here.

3 The pour, per line

Product and element as the title, with mix, calibration curve and order below. A free line has the Start pour button to begin the next one.

4 The coldest point decides

The bar runs up to release: the lowest sensor against the target strength. When the time comes: Release strength reached. Mould off and demoulding are two targets; set more than one per measurement.

Start pour

Starting a pour from the casting bed.

No name to think up and no box to look for. You start at the line where you are pouring, and fill in what you are pouring.

  1. Choose the line

    On the hall board, at a free line. The platform then knows which boxes are on it.

  2. Start pour

    One button. The form opens with the card Pour on Line 3 · Hall 3.

  3. Fill in the fields

    Product, element, mix and, if needed, the order. The mix selects the calibration curve that goes with it; each line has a default mix ready.

  4. The measurement runs

    On the boxes of that line. On the hall board, the pour appears with product and element as the title.

The start form in the Verboom Platform, shown in the Dutch interface: the card Pour on Line 3 · Hall 3, Plant North, with the fields Product (hollow-core slab 200), Element (batch 16), Mix (K200 · hollow-core slab C45/55) and Order (De Zonnehof housing estate). Below the mix: the mix selects the calibration curve that goes with it.
Example with made-up data, in the Dutch interface. No name to type in: line and date are already filled in.
Coming
  • A valve that automatically follows every pour on its line
  • An expected release time per line
  • Product, element and mix as badges in the measurement list and on the measurement page as well
A red gateway with an antenna at the window of a precast hall; through the window you see the casting beds in the hall.
The gateway at the window of a precast hall.
Plug & play

One gateway in the hall. Plug it in, and the hall is connected.

The gateway connects the heating valves and the LED towers wirelessly (LoRa) to the Verboom Platform. The Sensorboxes send their measurements themselves, via LTE‑M.

Its own SIM card

No plant network and no Wi-Fi needed. Your IT environment stays out of it.

Wireless through the hall

No cables to every casting bed. Valves and LED towers connect to the gateway via LoRa.

No more heating than necessary

The valve controls on maturity, not on the clock. Heat only where the concrete is lagging behind, and closed as soon as the target is reached.

The mix

Ready after eight hours, when you had twelve?

Then there is cement in it that you do not need. In the precast plant, the mix is your own choice. The measurement shows per batch how much margin there is.

Worked example on request

We work it through with you, with your own cement price and your own cycle. An order of magnitude, not a promise.

  • Per batch: how much earlier than necessary the target is reached
  • What that means for cement and heating
  • How much room your exposure class and the standard leave

The concrete standard sets a minimum cement content per exposure class, and a different mix needs a new calibration curve. We provide the insight; you and your concrete technologist decide.

Contact

Know when your concrete is ready.

And do not heat for longer than that. Want to see how it works on your own line? Call or email us and we will look at your hall together.