Road construction · In practice

In practice.

Forty years of measuring for the largest contractors in the Netherlands, in asphalt too since 2024. This is how a job with us works.

How we got here

Forty years of saying no. Until now.

For forty years we have worked for the largest builders in the Netherlands. Almost all of them also have an infrastructure division, and it often asked us whether we could help there too. We always said no: concrete was our trade.

With the new generation we say yes. The technology overlaps: temperature in a layer, cooling, the weather, a record for the client. We already know the people, and we speak the language of construction.

40 years
For the largest builders
in the Netherlands
1 box
For concrete and asphalt,
all year round
1 platform
For building site, precast plant
and road
2024
First trial sections
in asphalt
Since 2024

Every value arrives.

In October 2024 we measured for a large Dutch road builder on the first trial sections of a recycling train that reworks the old surface course in place. The measuring points lay under the hot asphalt, up to 100 °C, and survived it. What disappointed then was the transport of the data: wireless tags with a master and a repeater, which failed and only later showed what had been measured.

That is why the Sensorbox measures with a cable to the box and sends via LTE-M or Wi-Fi. Every measurement is stored in the box and sent on as soon as there is coverage. No repeater, no gap in the curve.

2024
First trial sections · in-place recycling
  • Whereunder the hot asphalt, up to 100 °C
  • Dataevery measurement stored and sent on via LTE-M or Wi-Fi
  • RecordPDF and CSV, with weather log, loads and the machine reports
A job with us

How your first job works.

  1. 1Before

    The job in the platform

    Location, layer, mix and planning. You read in the mix sheet; from then on the asphalt weather calculates along.

  2. 2Set-up

    Where the measuring points go

    The platform suggests the set-up; we go through it with your site manager. Which machines and exports you use, we check beforehand.

  3. 3On site

    The boxes

    We set up the boxes and do the start check with the crew. During the job everyone follows the same screen.

  4. 4Afterwards

    Going through the job record together

    With playback and the check of the expected cooling: what went well, what stood out, what you take to the next job.

Roads

Plan a job with us.

A new surface course, a trial section with the recycling train, a night with low-temperature asphalt? Tell us which job, which layer and which mix. We set up the job in the platform, make the measurement plan and put the box out.