Road construction · The platform

The platform.

Plan on the weather beforehand, follow the layer during the job, and look back at everything afterwards. On computer, tablet or phone, for everyone in your company.

One platform for road builders

From planning to the paving record.

Four moments when you want to know something. The platform answers all four, from the same measurement and the same calculation model.

  1. 1Before

    Can we pave tomorrow?

    Per hour the chance that the weather check passes and you have enough rolling time, at the location of the job.

    Asphalt weather
  2. 2During

    How long can I still roll?

    The temperature in the layer, every minute, and when it leaves the window of your mix.

    The site screen
  3. 3Opening

    When is the layer cool enough?

    The expected time to the limit you set, and a notification as soon as the layer is below it.

    Alerts
  4. 4After

    What do I record?

    The record: the weather log with the KNMI measurement, the temperatures from the paving plan and the reports of your machines.

    The record
Before · Asphalt weather

Per hour the chance that the work can go ahead.

An asphalt crew is booked months ahead, and a cancelled day costs money. So you don't plan on one weather report, but on the chance.

91 weather scenarios instead of one weather report

Two European weather services run their models dozens of times, with small differences. The platform checks each scenario and counts how often the work can go ahead. Seventy percent or more turns green.13

The weather check, per mix

Not below 5 °C, no precipitation, air at least wind plus 5 for porous asphalt and thin surface courses, and the season and wind limits for two-layer porous asphalt. With the wind at 1 m above ground, where the Dutch RAW measures.12 In Germany it calculates with the ZTV Asphalt-StB 26.

The rolling time for your layer

From our cooling model: layer thickness, temperature behind the screed, air, wind, sun and base. Per hour, also at night, with the spread across the scenarios.

Save, share, set up

Save the job, send the link to the crew and set up the measurement for the day itself with one click.

Your own mixes

Read in the data sheet of your mix, the declaration of performance or the type test: the platform copies the temperatures into your mix. After two jobs with the same mix it adjusts the rolling time to what you measured yourself.

The asphalt weather grid: per day and per hour the chance in percent, green from seventy percent, and on the right the hour card with weather, weather check and rolling time.
Click an hour: weather, weather check, rolling time and the chance from all scenarios.
During · The site screen

In the window. 14 minutes left.

The site screen sets the temperature in the layer against the window of your mix, and shows what that means for the rollers and the road.

Every minute, live

During the work the Sensorbox measures every minute and stays connected. As soon as the road can open, it returns to its normal rhythm by itself.

The expected time adjusts itself

Our model calculates from the moment of paving how the layer cools, and adjusts to what the layer actually does. So you know when it leaves the window and when the road can open.

Joint and base included

Measuring points with a role: in the layer, at the longitudinal joint, in the base. Each with its own limit.

An alert in time

In the app, by text and by email, and on the led tower beside the job: as soon as the layer drops below the window, or the road can open.

One tap for what happens

Paver passed, load unloaded with the mix temperature, first and last roller pass, standstill with the reason, road open: one tap on the phone, with the layer temperature at that moment.

The site screen of an asphalt measurement: in the window, 14 minutes left; per measuring point the temperature and the cooling per minute, and the trend with the expected curve up to opening.
The site screen: the layer, the joint and the base, with the expected curve up to opening.
A job, not a single measurement

All sections on one screen.

An asphalt job is a series of sections one after another. The job screen shows them side by side, with the same set-up in every section.

The cross-section per section

Per section the measuring points in the cross-section of the road, in heat colours: middle, joint, edge and base.

Compare sections

Which section was colder than the rest at the first roller pass, and where the layer stayed longer in the window.

Every load

Departure, arrival, unloading and the temperature of the mix, from the weighbridge ticket or with one tap. The transport chain shows which load was on the road for a long time.

Deviations as they happen

Cooled faster than expected, laid too cold, a section colder than the others, a measuring point that sends nothing: you get a notification with possible explanations, and record the cause and the action.

Playback

A time slider over the whole job: the state per section, what the expected cooling said at that moment, the loads and the deviations. For the review with the crew.

Who it is for

One measurement, four people looking at it.

The road builder buys, but the curve in the layer is for everyone on the job, and for whoever assesses the work.

Site manager

How long can I still roll, and when can the road open?

Sees it on tablet or phone, from the safe spot by the box, and gets an alert when the moment comes. Nothing to operate for whoever is on the machine.

Work planning

Do we pave tomorrow, or move a day?

Plans on the chance per hour instead of on one weather report, and sees which day has the widest window. For in-place recycling also: does the heat get deep enough?

Quality control

The work plan says where you measure. The record shows what you measured.

The weather log, the temperatures from the paving plan, the loads, the machine reports and the curve per measuring point in one record, as PDF and CSV.

Client

From planning on assumptions to managing on facts.

That is how Rijkswaterstaat wants to manage asphalt: knowing continuously what happens in the layer.7 Every job with the curve in the layer and a record delivers that, with access and export per section.

Roads

Plan a job with us.

A new surface course, a trial section with the recycling train, a night with low-temperature asphalt? Tell us which job, which layer and which mix. We set up the job in the platform, make the measurement plan and put the box out.

Emailsales@verboom.com Call+31 182 37 98 60
Bring alongThe job, the layer and the mixwhich paver and roller you use, and what you want to know

Sources

  1. Rijkswaterstaat / InnovA58, Smart sensors give asphalt a voice (title translated), October 2025: programme DAVA, "from planning on assumptions to managing on facts".
  2. CROW, Standaard RAW Bepalingen (the Netherlands), 81.22.03: measure the temperature and wind speed on site, at 1 m above ground; no paving below 5 °C; for porous asphalt and thin surface courses air at least wind + 5; for two-layer porous asphalt 1 April to 1 November and limits for wind and temperature.
  3. ECMWF, ENS ensemble (51 scenarios), and Deutscher Wetterdienst, ICON-EPS (40 scenarios); fetched hourly via Open-Meteo.