Road construction · Quality assurance

Quality.

What you measure and record during the job ends up in one record afterwards, as PDF, CSV or through the customer API. With the source of every value.

The record per section

The weather log and temperatures the RAW asks for, automatically in the record.

The RAW wants the temperature and wind on site recorded. The method statement wants to know how warm the layer was at the first roller pass. Afterwards it is all in there. What your contract requires, you agree with your client; the record supplies the data.

The weather log, measured

Per hour the air, the wind at 1 m, the precipitation and the weather check. Measured by the nearest KNMI station where possible, with the source shown.14

The temperatures from the paving plan

Before paving, behind the screed, first and last roller pass, window left, opening: per measuring point, at the moment itself. With every load and every standstill included, and the reason for it.

PDF, CSV and API

The record as a PDF for the client, as CSV for your own records, and through the customer API straight into your own systems.

Reads the reports of your machines

Drag in the report from the paver or roller, as PDF or export. Reading is set up for Vögele RoadScan and WITOS, MOBA PAVE-IR, HAMM and BOMAG; send us an export from your own machine beforehand and we will check it. The weighbridge ticket from the plant may be a photo. The platform puts it in the record, the surface from the machine next to the measurement in the layer. The original file stays stored with the measurement.15

The record of an asphalt layer: the job, the hourly weather log with the KNMI measurement and the weather check, the temperatures at the moments of the paving plan, and the trend.
The record: one A4 page, as PDF or CSV.
The job record

The whole job, not just one section.

All sections in one record

Per section the cross-section with the measuring points, the first roller pass per point, when the layer left the window and when it was cool enough. And planned against actual: start, rolling time, temperature behind the screed, air and wind.

Thermal process index

Per section an indicator from 0 to 100 from the temperature at the roller pass, the rolling time in the window, the spread across the measuring points and the deviations of the asphalt itself. One weak part means: take a closer look. An indicator of process control, not a certification.

Data reliability, separately

Next to the index it says how far you can rely on it: complete readings, no failed sensor, roller pass tapped rather than estimated. Missing data does not make the asphalt worse or better, so it does not count in the index.

Deviations and how they were handled

Every deviation with when it was seen, the possible explanations (hypotheses, not established causes), the cause the crew recorded and the action taken.

Source

With every value: where it comes from.

A record is only useful if you know what was measured and what was not. That is why every value carries a label.

measured

By a sensor in the asphalt, or by the weather station where the source says so.

imported

From a machine export or weighbridge ticket, with the original file stored with the measurement.

manual

Tapped on the phone or entered, with who and when.

calculated

By the Verboom calculation model, and then marked as "expected".

And a time check: if a box clock runs ahead, a machine export is in another time zone, a roller pass lies before laying or a load was unloaded before it left, the record says so.

Roads

Plan a job with us.

A new surface course, a trial section with the recycling train, a night with low-temperature asphalt? Tell us which job, which layer and which mix. We set up the job in the platform, make the measurement plan and put the box out.

Emailsales@verboom.com Call+31 182 37 98 60
Bring alongThe job, the layer and the mixwhich paver and roller you use, and what you want to know

Sources

  1. KNMI, Hourly weather data of the Netherlands (daggegevens.knmi.nl): temperature, hourly mean wind at 10 m and precipitation per station. The wind at 1 m follows from the logarithmic wind profile for open terrain.
  2. Vögele (WITOS, RoadScan), MOBA (PAVE-IR), HAMM and BOMAG are trademarks of their owners. The Verboom Platform reads their reports and exports; Verboom is not a partner of these manufacturers. Export format of thermal profiles: AASHTO PP 80 / R 110 (ICDM guidelines 8.0).